Help customers say yes to clean energy

Whether you are installing solar, a heat pump, or an EV charger, completing a site assessment is the first step in your customer’s clean energy journey.


The problem

The solution

It’s the first step in a project. If somebody says to me, I want solar or storage, the first thing I give them is an authorization link from UtilityAPI for their utility.”

Dan Martin, Founder and CEO at Amped Solutions

Bill Data

Size your clean energy project

Use Bill Data to baseline your customers’ annual energy usage and design a clean project that meets their needs.

Meter Data

Expedite interconnection

Collect all customer metadata needed to expedite interconnection application submission using Meter Data.

Interval Data

Adapt to policy changes like NEM 3.0

Leverage Interval Data to maximize the benefits of a NEM 3.0 solar + storage project.

Interval Data

Model utility bill savings

Use Interval Data and Meter Data to accurately model utility bill savings from your proposed clean energy project.